Lobbied Toronto

Command Palette

Search for a command to run...

Manager, Business Improvement & Standards, Engineering & Construction Services

Manager, Business Improvement & Standards, Engineering & Construction Services0 communications in the past year

Lobbied by

Integrity Pipeline Products

9

Without restricting flow, LittaTrap catchbasin (CB) insert filters stormwater runoff, preventing pollutants from discharging into waterways. Inflow dampening dissipates energy allowing sediment capture in sumped CBs, thus reducing TSS. Retrofit & new CBs

Seeking approval of SDR 9 Crosslinked Polyethylene tubing made using the high pressure peroxide extrusion method (PEXa) for use as buried water service piping. PEXa is available in 3/4" thru 2" dia in CTS and is suitable for HDD or open cut installation.

Requesting the addition of AFC Series 2500 to the list of approved Gate Valves - 100 mm to 400 mm on page 145 of the Toronto Design Criteria for Sewer & Watermains in the Materials Specifications section (Chapter 6).

DECAST

1

Introduce a new precast concrete stormwater management system that will allow Toronto to maximize land use

Infra Pipe Solutions

1

Discuss specifications for High Density Polyethylene pipe systems both Structural Profile Wall & Solid Wall for use in Stormwater, Sanitary Sewer, WWTP and Water transmission both for storage and conveyance of pipe with city staff.

Intergraph Canada

1

Looking to engage in discovery and discussion surrounding whether City of Toronto has any business/process improvement initiatives that could benefit from a commercial off the shelf enterprise project performance software solution.

Intergraph

1

Looking to engage in discovery and discussion surrounding whether City of Toronto has any business/process improvement initiatives that could benefit from a commercial off the shelf enterprise project performance software solution.

TACC Construction

1

Introduce a new precast concrete stormwater management system that will allow Toronto to maximize land use

Tracenet

1

Use of TraceNet for the tracking of soil in relation to O. Reg. 406/19: ON-SITE AND EXCESS SOIL MANAGEMENT

Recent activity